All Antofagasta mines to be powered by renewables at lower cost
JOHANNESBURG (miningweekly.com) – All of the electricity of the mining division of the London-listed Chile-based Antofagasta plc will from 2022 be from renewable sources at lower cost.
This follows the signing by Antofagasta’s Centinela copper mine of a new power purchase agreement (PPA) with Engie Energía Chile, effective from 2022 and extending to 2033.
Antofagasta CEO Iván Arriagada described the agreement as an important step in achieving the group’s target of reducing carbon emissions by 300 000 t.
In a media release to Mining Weekly, Antofagasta stated that under the new agreement, Centinela would cancel two existing PPAs, which were due to expire in 2026 and 2027, and sell its indirect 40% interest in the Hornitos thermal power station to Engie.
This would result in an attributable post-tax writedown of about $43-million, which would be recognised in Antofagasta's half-year financial results.
After the writedown, the new renewable energy contract would be value accretive, as power costs would be significantly reduced in stages from 2020 onwards.
Formed in 2014 with the merging of the Esperanza and El Tesoro mining companies, Centinela mines sulphide and oxide deposits 1 350 km north of Santiago, in the Antofagasta region.
It produces gold- and silver-containing copper concentrate through a milling and flotation process, as well as molybdenum concentrate.
Using the solvent extraction and electrowinning process, it produces copper cathodes.
Antofagasta has four copper mines and mining represents more than 96% of group revenue and earnings.
In addition to mining, it has a transport division that provides rail and road cargo services in northern Chile to predominantly mining customers, which include some of its own operations.
All of the operations are located in the Antofagasta region of northern Chile, except for its flagship Los Pelambres, which is in the Coquimbo region of central Chile.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation