Oriole achieving good progress on sampling in Cameroon
Aim-listed Oriole Resources has achieved good progress during an early-stage sampling programme on the eastern portion of its 90%-owned Central Licence Package (CLP) in central Cameroon, CEO Tim Livesey says.
The district-scale CLP comprises eight contiguous licences of previously unexplored paleo-proterozoic to pan-African age rocks that are noted to be highly prospective for orogenic-style gold mineralisation.
Sampling of the remaining four ‘Priority 1’ grids is now complete for a further 3 114 samples.
Samples for Grid 2 and Grid 4 have been dispatched for analysis and results are expected by the end of the second quarter or early in the third quarter.
Sampling has also been completed for a further 1 239 samples over an extensional grid (Grid 6) at the Mbe licence, along strike from where the company previously reported a best result of 838 parts per billion gold.
A multi-element review of the pilot area has identified a number of pathfinder elements that will aid future targeting.
A technical study is now under way to compare laboratory and handheld X-ray fluorescence data to help reduce the time and cost of multi-element analysis going forward.
Geological line mapping over the Mbe anomaly is about 70% complete.
A further licence, Maboum, has been applied for to the east of the CLP and is contiguous with the existing package. The licence application is now live on the Cameroon mining cadastre.
“The field crews have been busy with mapping and sample collection – the boots on the ground de-risking that every project requires in the early stages of exploration – trying to cover as much ground as possible before the rains restrict access.
“Orientation work, utilising multi-element data, is providing interesting leads, and the potential for identification of overprinting mineralised systems adds a further layer of opportunity.
“Through this work, we are seeing yet more evidence that this package of licences has great potential to be a new gold district,” Livesay notes.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation