AEL compliance reporting
(Virtual Showroom): Atmospheric Emissions Licenses (AEL’s) are obligatory under the National Environmental Management: Air Quality Act 39 of 2004 (AQA) for activities that result in atmospheric emissions which have a significant negative environmental impact, listed in GN 893 of November 22, 2013.
For an AEL application process, either the local District Municipality, Metropolitan Municipality or Provincial Department is the licensing authority who can issue an AEL. Once an AEL has been issued, the local Municipality or Provincial department concerned becomes the competent authority to whom compliance reports must be submitted.
Atmospheric Emission Licences generally require quarterly reporting with regards to compliance obligations, with content of the report to include as a minimum:
- Pollutant Emissions Trends.
- Dust fallout and emission monitoring reports.
- Compliance Audit Reports (internal & external) showcasing compliance with the licence conditions.
- Details on major upgrades or projects undertaken and installation of abatement equipment.
- Complaints and close-out of complaints.
Licence Holders however often do not compile and submit these reports as required, placing them in non-compliance with the requirements of the held AEL.
In view of this, environmental consultants and auditors from the ENVASS Group advise atmospheric emissions licence holders to approach compliance as a necessary step to ensure that their operations run smoothly and sustainably. Based on two decades of consulting to mining companies, ENVASS has documented common compliance and audit related oversights that licence holders should address to ensure that their reporting programmes remain effective, and their operations are compliant.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation