https://www.miningweekly.com

$105m earmarked for Karowe expansion in 2023

29th November 2022

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Vancouver-based Lucara Diamond will spend up to $105-million next year on the underground expansion of its Karowe mine, in Botswana.

In its 2023 operating guidance, the company says that its focus will be predominantly on shaft sinking activities, along with the construction of the bulk air cooler, tendering of the underground development contract and underground equipment purchases.

Lucara has also initiated a review of the current programme schedule and budget, which it says will be completed in the first quarter of next year.

In August, Lucara updated the estimated capital cost for the underground expansion from $534-million to $547-million to reflect expected pricing changes following the execution of the main sink contract.

The underground expansion project will extend the Karowe mine’s life by 13 years.

Meanwhile, Lucara has set a sales guidance of 385 000 ct to 415 000 ct and a revenue target of $200-million to $230-million for next year. This compares with the 2022 sales guidance of 300 000 ct to 340 000 ct and the revised revenue guidance of $195-million to $225-million.

The 2023 forecast assumes that 52% of the carats recovered will come from the higher value units in the South Lobe of the Karowe mine, and the balance will be recovered from the Central Lobe. Central Lobe material, while higher grade, has a lower weight percentage of stones greater than 10.8 ct in size, when compared with South Lobe material.

Lucara says it expects to mine between 4.1-million and 5.1-million tonnes.

The assumptions for carats recovered and sold, as well as the number of tonnes processed are consistent with achieved performance in recent years.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION