Rui Gomes
1 |
IRON ORE
Resources Watch
This week:
Kumba’s financial year earnings climb 19% to R17-billion.
The long-term iron-ore outlook remains positive.
And, a new range of slurry pumps provides extended wear life.
16th February 2012
Video Clips
New range of slurry pumps provides extended wear life
Weir minerals Africa, a slurry equipment solutions provider, has designed a new range of slurry pumps that will soon be available to the mining industry.
By: Yolandi Booyens
10th February 2012
Mining Services
Unlined pumps introduced as primary mill circuit offering
Slurry equipment solutions provider Weir Minerals Africa has positioned the Warman MCU range of all-metal unlined centrifugal slurry pumps as its primary offering for mill circuit duty and its standard offering on new projects, leveraging the...By: Natalie Greve
30th September 2011
Mining Services
Company starts manufacturing larger pumps
Slurry equipment solutions provider Weir Minerals South Africa has completed the construction of a manufacturing facility, for the production of 350 mm and 450 mm Warman centrifugal slurry pumps, at its Isando branch, in Johannesburg.By: Jessica Hannah
26th August 2011
Mining Services
Latest pump offering proves itself
The latest pump offering from slurry equipment solutions provider Weir Minerals, the Warman Mill Circuit (MC) slurry pump, has been trialled at a number of mines in West and Central Africa and has recorded significant success in increasing mill...By: Natasha Odendaal
10th June 2011
WEIR MINERALS AFRICA
Company Announcement: Warman MC Pump Proves Itself
Attached please find a press release on: The latest pump offering from Weir Minerals, the Warman Mill Circuit (MC) slurry pump, has been trialled at a number of mines in West and Central Africa and has recorded considerable success both in terms...
By: Yolande Botes
23rd May 2011
Mining Services
First orders for slurry pump received
International pumps manufacturer Weir Minerals Africa reports that it has recently started marketing its new mill circuit duty slurry pump, which is mostly suitable for mill discharge applications.By: Dimakatso Motau
4th February 2011
Copper
First mill circuit pump supplied in Africa
The first Warman MCR mill circuit pump supplied in Africa is currently pumping mill discharge slurry at mining company First Quantum Minerals’ Frontier copper mine, in the Democratic Republic of Congo, on a trial basis. The negotiations to...By: Tracy Hancock
27th August 2010
Mining Services
Warm response to new pumps
Minerals solution provider Weir Minerals Africa has released seven units of its newly launched centrifugal or expeller seal, which can be retrofitted to its Warman AH pumps, a heavy-duty slurry pump range.By: Eleanor Seggie
11th June 2010
Pumps
Pumps go for gold at Loulo project
Representation in Africa, specifically in Mali, and a range of high-quality manufactured pumps capable of meeting all process plant pumping requirements secured the order for thirty Warman pumps for the Loulo gold project.17th June 2005
Breaking News
SA pump manufacturer wins Mali mine order
Local pump-manufacturer CH Warman has been awarded a contract for the supply of 30 pumps to Randgold Resources’ Loulo gold project, in Mali.By: Liezel Hill
4th May 2005
1 |
Advertisement
Topic Multimedia
Second Take: West Africa iron-ore
Resources Watch
US legislators visit Sasol mines to view new life-saving technology
Sasol to apply for Waterberg coal mining licence
Eskom calls for urgent ‘guidance’ on its role in energy plan
Sasol opens new R3.5bn coal shaft in Mpumalanga
Higher gold price needed to sustain mining – Gold Fields
Second Take: Mining investment
Resources Watch
Second Take: West Africa iron-ore 
Resources Watch 
US legislators visit Sasol mines to view new... 
Sasol to apply for Waterberg coal mining licence 
Eskom calls for urgent ‘guidance’ on its... 
Sasol opens new R3.5bn coal shaft in Mpumalanga 
Higher gold price needed to sustain mining –... 
Second Take: Mining investment 
Resources Watch 
Underground coal gasification has key role to play in Southern Africa
WDC hopes to resolve Zim diamonds issue at upcoming KP meeting
Anooraq focusing...
Tanzania's Jengo wants mine listings on African exchanges
Wits Gold plans...
London Mining...
Tungsten-miner...
Kebble R1bn unlocked as JCI/R&E/Investec/Letseng settle
Geovic confident on Cameroon cobalt project financing
Underground coal gasification has key... 
WDC hopes to resolve Zim diamonds... 
Anooraq focusing on doubling output... 
Tanzania's Jengo wants mine listings... 
Wits Gold plans to move De Bron into... 
London Mining expects iron-ore prices... 
Tungsten-miner Malaga mulls 2nd mill,... 
Kebble R1bn unlocked as... 
Geovic confident on Cameroon cobalt... 
Advertisement


















