GOLD 1390.93 $/ozChange: 5.00
PLATINUM 1474.00 $/ozChange: -12.50
R/$ exchange 9.45Change: -0.04
R/€ exchange 12.18Change: -0.10
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
Maintenance Infrastructure
 
Anglo Platinum's Projects

Thembelani men and materials shaft at 1 074 m

Platinum-mining company Anglo Platinum reports that the men-and-materials shaft at the Thembelani two project, which is still in the execution phase, is currently 1 074 m deep. The shaft has a planned depth of 1 178 m and is scheduled for...
10th December 2010
 
All

Renard diamond project feasibility study, Canada Restricted

The feasibility study plans to build on a preliminary assessment, which, in March 2010, indicated the potential to produce about 30-million carats of diamonds over a 25-year mine life.
12th November 2010
 
 
Topic Multimedia
image
VIDEO
image
View all
 
 
Second Take: New mining technologies Video
Resources Watch Video
New technology potential game changer –... Video
Mozambique gold project advancing – Auroch Video
Dynamics of mining industry changing – Auroch Video
AngloGold Ashanti to cut $500m costs, sell... Video
Mining doomed if ‘crazy’ pay increases... Video
Second Take: Botswana–SA coal rail link Video
Resources Watch Video
Audio
View all
 
 
Underground coal gasification has key... Audio
WDC hopes to resolve Zim diamonds... Audio
Anooraq focusing on doubling output... Audio
Tanzania's Jengo wants mine listings... Audio
Wits Gold plans to move De Bron into... Audio
London Mining expects iron-ore prices... Audio
Tungsten-miner Malaga mulls 2nd mill,... Audio
Kebble R1bn unlocked as... Audio
Geovic confident on Cameroon cobalt... Audio