Joe Meyer
1 |
COAL
Grootegeluk Medupi expansion on course to produce first coal in May
The Grootegeluk Medupi expansion project (GMEP), in Limpopo, which will provide coal to State-owned power utility Eskom’s Medupi power station, is on track to produce its first coal in May 2012 and is currently 65% complete.By: Jessica Hannah
28th October 2011
Exxaro Grootegeluk Medupi expansion
Exxaro performs own EPCM for expansions
South African mining group Exxaro has decided to oversee the engineering procurement and construction management (EPCM) at its mega-Grootegeluk Medupi expansion project, in Limpopo.By: Jessica Hannah
3rd December 2010
Exxaro's Grootgeluk Medupi Coal Expansion
Exxaro’s R9bn Medupi coal expansion project at Grootegeluk
Exxaro’s Grootegeluk Medupi coal-mine expansion project, which will provide the coal to meet the fuel demand of Eskom’s new 4 800 MW dry-cooled Medupi power station under construction in Limpopo province, is in the detail design phase. South...By: Martin Creamer
11th December 2009
COAL
Exxaro in R30bn-plus coal-based development plan in Waterberg
JSE-listed top-forty company Exxaro is involved with coal-based development plans worth at least R30-billion, the company told journalists on Wednesday.
“You are standing on the future of coal-mining in South Africa,” Exxaro CEO Sipho Nkosi...
By: Martin Creamer
4th November 2009
Exxaro's Coal Projects
Grootegeluk mine expansion on schedule
Diversified miner Exxaro’s Grootegeluk mine will play a significant role in South Africa’s energy provision in the future, by supplying coal to State-owned electricity utility Eskom’s Medupi power station, which is currently under construction.By: Kelly Farthing
14th August 2009
Mine Profile
Grootegeluk mine, South Africa
An openpit mine, situated in Limpopo province.
By: Carla Thomaz
27th July 2007
Coal
Jaw-crusher puts end to instability
Officials at the Grootegeluk coal-mine in the Limpopo Province do not try to conceal their feelings about the new Sandvik jaw crusher which has put an end to production stoppages in the mine’s largest beneficiation plant.By: andrew lanham
1st October 2004
Coal
Major potential in the Waterberg
Dr Con Fauconnier, CE of Kumba Resources, called on Transnet to consider extending the Coallink line to the Waterberg coalfield. The cost of such a heavy-duty line would be large on any scale, and prompts the question; what is the quality and the...By: andrew lanham
16th April 2004
1 |
Advertisement
Topic Multimedia
Second Take: West Africa iron-ore
Resources Watch
US legislators visit Sasol mines to view new life-saving technology
Sasol to apply for Waterberg coal mining licence
Eskom calls for urgent ‘guidance’ on its role in energy plan
Sasol opens new R3.5bn coal shaft in Mpumalanga
Higher gold price needed to sustain mining – Gold Fields
Second Take: Mining investment
Resources Watch
Second Take: West Africa iron-ore 
Resources Watch 
US legislators visit Sasol mines to view new... 
Sasol to apply for Waterberg coal mining licence 
Eskom calls for urgent ‘guidance’ on its... 
Sasol opens new R3.5bn coal shaft in Mpumalanga 
Higher gold price needed to sustain mining –... 
Second Take: Mining investment 
Resources Watch 
Underground coal gasification has key role to play in Southern Africa
WDC hopes to resolve Zim diamonds issue at upcoming KP meeting
Anooraq focusing...
Tanzania's Jengo wants mine listings on African exchanges
Wits Gold plans...
London Mining...
Tungsten-miner...
Kebble R1bn unlocked as JCI/R&E/Investec/Letseng settle
Geovic confident on Cameroon cobalt project financing
Underground coal gasification has key... 
WDC hopes to resolve Zim diamonds... 
Anooraq focusing on doubling output... 
Tanzania's Jengo wants mine listings... 
Wits Gold plans to move De Bron into... 
London Mining expects iron-ore prices... 
Tungsten-miner Malaga mulls 2nd mill,... 
Kebble R1bn unlocked as... 
Geovic confident on Cameroon cobalt... 
Advertisement


















