HMS Plant
COPPER
Kipoi exceeds Tiger's expectations
ASX- and TSX-listed copper miner Tiger Resources has reported that the heavy media separation (HMS) plant at its Kipoi project, in the Democratic Republic of Congo, has been producing at 200% above its nameplate capacity. During May 12, the HMS...16th May 2012
Tiger Resources Limited
Company Announcement: September 2011 Quarterly activities report
Tiger Resources Limited is pleased to report its activities for the September 2011 quarter.
1st November 2011
All
Kipoi copper project Stage 1, Democratic Republic of Congo
A scoping study on a solvent extraction/electrowinning plant at the Kipoi copper project has proved positive.
By: Sheila Barradas
14th October 2011
COPPER
Kipoi scoping study proves profitability - Tiger
A scoping study into a solvent extraction/electrowinning (SXEW) plant at ASX- and TSX-listed Tiger Resources’ Kipoi copper project, in the Democratic Republic of Congo, has proved positive. “The results from the preliminary economic...28th September 2011
Australian Mining
Australian multidisciplinary firm commissions projects in Africa
Project management, infrastructure and mineral process plant design and construction for the mining industry DRA Mining Solutions, in Perth, has commissioned a number of projects in Africa.By: Jessica Hannah
5th August 2011
Consulting Engineers
Commissioning of Kipoi’s HMS plant under way
ASX- and TSX-listed copper-miner Tiger Resources reports that construction of the heavy media separation (HMS) plant for the stage one development at its Kipoi copper project in the Democratic Republic of Congo (DRC) has been completed and...22nd April 2011
COPPER
Tiger starts up 35 000 t/y copper mine in DRC
ASX- and TSX-listed Tiger Resources has started mining operations at its Kipoi copper project, in the Democratic Republic of Congo (DRC). Ore and waste mining started at the Kipoi central deposit during this week with ore grade material being...12th November 2010
BASE AND PRECIOUS METALS
Jabiru may build A$10m HMS plant at WA operation
Base and precious metals developer Jabiru Metals has completed a definitive feasibility study on a A$10-million heavy media separation (HMS) plant at its Jaguar multi-metal operation, in Western Australia. The company said on Thursday that the...23rd September 2010
BASE METALS
Anvil mining reports $18m loss on lower sales
Base-metals miner Anvil Mining has reported a net loss of $18,8-million for the quarter ended March 2009, compared with a net income of $21,6-million for the first quarter of last year, the company reported on Friday. Anvil stated that the...15th May 2009
COPPER
DRC project costs rise almost 50% - Anvil
TSX- and ASX-listed Anvil Mining now expects its Kinsevere Stage II project, in the Democratic Republic of Congo (DRC) to cost $380-million, $123-million higher than construction cost projections in a feasibility study on the project. Cost...By: Liezel Hill
12th May 2008
BASE METALS
Commissioning to get under way on DRC copper furnace
Base metals miner Anvil will start the commissioning of its Kinsevere copper mine's electric arc furnace (EAF) near Lubumbashi, in the Democratic Republic of Congo (DRC) in December, to ramp up to full production in the first quarter of next year.By: Mariaan Webb
23rd October 2007
COPPER
Anvil starts commissioning HMS plant at DRC copper project
TSX-listed copper and silver miner Anvil Mining on Monday announced that AMCK Mining, a joint venture company involving Anvil (95%) and Mining Company of Katanga (5%), had started commissioning the heavy media separation (HMS) plant for the...11th June 2007
Advertisement
Topic Multimedia
Second Take: West Africa iron-ore
Resources Watch
US legislators visit Sasol mines to view new life-saving technology
Sasol to apply for Waterberg coal mining licence
Eskom calls for urgent ‘guidance’ on its role in energy plan
Sasol opens new R3.5bn coal shaft in Mpumalanga
Higher gold price needed to sustain mining – Gold Fields
Second Take: Mining investment
Resources Watch
Second Take: West Africa iron-ore 
Resources Watch 
US legislators visit Sasol mines to view new... 
Sasol to apply for Waterberg coal mining licence 
Eskom calls for urgent ‘guidance’ on its... 
Sasol opens new R3.5bn coal shaft in Mpumalanga 
Higher gold price needed to sustain mining –... 
Second Take: Mining investment 
Resources Watch 
Underground coal gasification has key role to play in Southern Africa
WDC hopes to resolve Zim diamonds issue at upcoming KP meeting
Anooraq focusing...
Tanzania's Jengo wants mine listings on African exchanges
Wits Gold plans...
London Mining...
Tungsten-miner...
Kebble R1bn unlocked as JCI/R&E/Investec/Letseng settle
Geovic confident on Cameroon cobalt project financing
Underground coal gasification has key... 
WDC hopes to resolve Zim diamonds... 
Anooraq focusing on doubling output... 
Tanzania's Jengo wants mine listings... 
Wits Gold plans to move De Bron into... 
London Mining expects iron-ore prices... 
Tungsten-miner Malaga mulls 2nd mill,... 
Kebble R1bn unlocked as... 
Geovic confident on Cameroon cobalt... 
Advertisement

















