GOLD 1572.58 $/ozChange: 6.93
PLATINUM 1434.00 $/ozChange: 10.50
R/$ exchange 8.40Change: 0.00
R/€ exchange 10.51Change: 0.03
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
Send to Friend
 
 Address to refer: http://www.miningweekly.com/article/vedantas-konkola-mine-in-zambia-reports-lower-q1-output-2010-07-30
 Article Headline: Vedanta’s Konkola copper mine reports lower Q1 output
 Abstract: London-listed Vedanta Resources said on Friday that first-quarter integrated copper production at its Konkola Copper Mines declined by 11%, after a national power grid failure in Zambia. Production dropped to 34 000 t in the quarter ended June 30. However the mined metal production increased by 26% to 24 000 t and the company was able to produce almost 28% more copper cathodes at 55 000 t, compared with the corresponding quarter.
 Your Name:
 Your e-mail:
 Your colleague's e-mail: - separate emails by commas, maximum limit of 4 addresses
 A personal note:
 

Please enter the letters you see in the image below
Verification Image. Please refresh the page if
                              you cannot see this
                              image.