GOLD 1572.90 $/ozChange: 7.25
PLATINUM 1431.50 $/ozChange: 8.00
R/$ exchange 8.41Change: -0.01
R/€ exchange 10.53Change: 0.02
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
Send to Friend
 
 Address to refer: http://www.miningweekly.com/article/kopane-plans-new-diamond-processing-plant-for-lesotho-project-2009-11-25
 Article Headline: Kopane plans new diamond processing plant for Lesotho project
 Abstract: Aim-listed Kopane Diamond Developments was considering increasing the capacity of its Liqhobong Satellite plant, in Lesotho, to 750 000 t/y, up from the current 450 000 t/y, until a larger plant could be built to process kimberlite from the Main Pipe at the Liqhobong mine. The company was expecting to start construction on a processing plant for the Main Pipe at the end of 2010, which it expected to phase in on a modular basis to eventually reach a capacity of 3,5-million tons a year or higher.
 Your Name:
 Your e-mail:
 Your colleague's e-mail: - separate emails by commas, maximum limit of 4 addresses
 A personal note:
 

Please enter the letters you see in the image below
Verification Image. Please refresh the page if
                              you cannot see this
                              image.