GOLD 1572.90 $/ozChange: 7.25
PLATINUM 1433.50 $/ozChange: 10.00
R/$ exchange 8.41Change: -0.01
R/€ exchange 10.53Change: 0.02
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
Send to Friend
 
 Address to refer: http://www.miningweekly.com/article/innovative-dynamic-integrated-mine-cost-model-improves-mine-cost-estimation-and-forecasting-2010-04-23
 Article Headline: Cost model improves mine cost estimation and forecasting
 Abstract: Mining Consulting engineering firm A&B Global Mining (ABGM) has developed a detailed and robust methodology to simulate variable mining cost drivers in a 3-D mine design and production schedule.
 Your Name:
 Your e-mail:
 Your colleague's e-mail: - separate emails by commas, maximum limit of 4 addresses
 A personal note:
 

Please enter the letters you see in the image below
Verification Image. Please refresh the page if
                              you cannot see this
                              image.