GOLD 1572.45 $/ozChange: 6.80
PLATINUM 1431.50 $/ozChange: 8.00
R/$ exchange 8.39Change: 0.01
R/€ exchange 10.50Change: 0.05
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
Send to Friend
 
 Address to refer: http://www.miningweekly.com/article/great-basin-gold-secures-power-for-burnstone-project-2009-06-08
 Article Headline: Great Basin Gold secures power for Burnstone project
 Abstract: South Africa’s power utility Eskom has undertaken to supply power to Great Basin Gold’s (GBG’s) Burnstone mine in the Mpumalanga province, the Toronto- and Johannesburg-listed company said on Monday. GBG has accepted an R119-million official budget quotation for a new supply of power to the Burnstone mine. This quotation outlines the project for the supply of power to the mine, which was planned to be completed in time for the commissioning of the metallurgical process plant that was currently under construction.
 Your Name:
 Your e-mail:
 Your colleague's e-mail: - separate emails by commas, maximum limit of 4 addresses
 A personal note:
 

Please enter the letters you see in the image below
Verification Image. Please refresh the page if
                              you cannot see this
                              image.