GOLD 1572.82 $/ozChange: 7.17
PLATINUM 1431.50 $/ozChange: 8.00
R/$ exchange 8.38Change: 0.01
R/€ exchange 10.49Change: 0.05
 
We have detected that the browser you are using is no longer supported. As a result, some content may not display correctly.
We suggest that you upgrade to the latest version of any of the following browsers:
         
close notification
powered by
Advanced Search
 
 
Send to Friend
 
 Address to refer: http://www.miningweekly.com/article/falling-steel-shuts-anglogold-ashanti-shaft-for-two-months-2009-11-02
 Article Headline: Falling steel shuts AngloGold Ashanti shaft for two months
 Abstract: The TauTona shaft of gold miner AngloGold Ashanti has been closed for two months, which will mean a 1 500 kg loss of gold production. The shaft has been closed so that repair to steelwork can take place safely, following the falling down a sub shaft of a so-called "penthouse" - a heavy steel structure that shields personnel from falling
 Your Name:
 Your e-mail:
 Your colleague's e-mail: - separate emails by commas, maximum limit of 4 addresses
 A personal note:
 

Please enter the letters you see in the image below
Verification Image. Please refresh the page if
                              you cannot see this
                              image.