Yanfolila gold project, Mali

28th April 2017 By: Sheila Barradas - Creamer Media Research Coordinator & Senior Deputy Editor

Yanfolila gold project, Mali

Name of the Project
Yanfolila gold project.

Location
The project comprises two main clusters of ore deposits: Komana East (KE), Komana West (KW), Guirin West (GW) and Gonka (GK), in the south; and Sanioumale East (SE) and Sanioumale West (SW), in the north of Mali.

Client
Hummingbird Resources.

The government of Mali is expected to pay Hummingbird $11-million for an additional 10% stake in Yanfolila.

Project Description
Hummingbird has completed an optimised mine schedule, which has improved the Joint Ore Reserves Committee-compliant ore reserve statement and updated economic sensitivities based on the new reserve and mine schedule for the Yanfolila gold project.

The project’s reserves have increased from 6.82-million tonnes at a grade of 3.03 g/t of gold in the January 2016 definitive feasibility study (DFS) to 7.04-million tonnes at a grade of 3.14 g/t of gold in the optimised mine schedule.

The DFS financial model has been updated to incorporate the increased ore reserve and new mine schedule, with a resulting improvement in project economics. The project will be developed as an openpit, low-cost gold- mining operation.

The DFS life-of-mine (LoM) plan envisages the progressive mining of five openpits, starting initially with KE and KW, and then progressing to GW, SE and SW.

Hummingbird is also considering developing the high-grade Gonka resource, initially as an openpit and then as an underground mine.

The plant will have a throughput of 1.24-million tonnes a year, producing up to 107 000 oz/y of gold.

The ore is nonrefractory and the simple process plant design uses gravity and carbon-in-leach (CIL) for the processing and recovery of the gold, which averages 92.5% over the LoM.

Jobs to be Created
Not stated.

Net Present Value/Internal Rate of Return
The project’s net present value (NPV) has increased from $88-million, at an 8% discount rate in the 2016 DFS, to an NPV, at an 8% discount rate, of $162-million.

The project’s internal rate of return has increased from 37% in the DFS to 60% in the optimised mine schedule.

Value
The project’s estimated capital expenditure has remained at $79.36-million from the DFS to the optimised mine schedule.

Duration
Initial gold pour is targeted for the end of 2017.

Latest Developments
The development of the Yanfolila mine is progressing on time and within budget.

The project is more than 60% complete.

The structural, mechanical, plate work and piping work have been under way for more than three months, while the plant foundations are largely complete.

The ball mill is complete and due for delivery to site in May.

Work on the CIL tanks is also expected to be finished next month.

The arrival of African Mining Services to start work on the tailings storage facility (TSF) and, subsequently, preproduction mining, are significant upcoming milestones as Hummingbird continues to ramp up development towards production.
 
Hummingbird has also signed a fuel supply contract with West African fuel producer Zen Petroleum Mali.

Further, Hummingbird has received the first tranche of $25-million bridge loan facilitypost quarter-end from Coris Bank.
 
Key Contracts and Suppliers
DRA Projects (DFS); CSA Global (mineral resource and ore reserves reports); Senet (metallurgical testwork, process design and engineering, and capital and operating cost estimates for the processing plant and the associated plant infrastructure); Schlumberger Water Services (hydrology and hydrogeological studies); and Ausenco Engineering Canada (design and cost estimates for the TSF); Afromix (agitators); Delkor (linear screens); Kemix (regeneration kiln and interstage screens); Metso (primary and secondary crushers, screens and feeders); African Mining Services (TSF) and Zen Petroleum Mali (fuel supply).

On Budget and on Time?
The project is still on budget and scheduled for first gold pour by the end of this year.