Western Turner syncline iron-ore project, Australia

15th July 2016 By: Sheila Barradas - Creamer Media Research Coordinator & Senior Deputy Editor

Western Turner syncline iron-ore project, Australia

Name and Location
Western Turner syncline iron-ore project, Australia.

Client
Hamersley Iron, a subsidiary of Rio Tinto.

Project Description
Hamersley is proposing a change to the approved Western Turner syncline iron-ore project, which incorporates:
• the Western Turner syncline Section 10 iron-ore project, which includes an above-water-table opencut mine and a link to the existing Tom Price mine operation, with an infrastructure corridor; and
• the Western Turner syncline Stage 2 – B1 and Section 17 deposits for an above- and below-water-table opencut mine and associated infrastructure.

The proposal includes the following additional components:
• above- and below-water-table extension of the approved Section 10 BRK pit,
• development of the above-water-table Section 10 BRK West pit;
• the development of the above- and below-water-table Section 10 MM East and MM West pits; and
• the discharge of surplus mine dewatering into the northern branch of the Hardey river.

Net Present Value/Internal Rate of Return
Not stated.

Value
Not stated.

Duration
Not stated.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Rio Tinto, tel +61 3 9283 3333 or fax +61 3 9283 3707.