Tiris uranium project, Mauritania

19th April 2024 By: Sheila Barradas - Creamer Media Research Coordinator & Senior Deputy Editor

Tiris uranium project, Mauritania

Name of the Project
Tiris uranium project.

Location
Mauritania.

Project Owner/s
Aura Energy.

Project Description
A front-end engineering design (FEED) study has confirmed excellent economics and capital efficiency to develop Tiris into a globally significant near-term uranium operation.

The FEED proposes average base case production of 1.9-million pounds a year of uranium over a 17-year mine life.

Envisaged is a shallow free-dig openpit mining and beneficiation operation delivering a low-cost, high-grade leach feed averaging 1 997 parts per million (ppm) of uranium for the first five years and 1 743 ppm  of uranium for the life-of-mine (LoM).

LoM production is estimated at 30.1-million pounds of uranium. The two-million-pound-a-year uranium processing plant is designed for future expansion beyond two-million pounds a year.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The FEED estimates an after-tax net present value of $366-million, at an 8% discount rate, and an internal rate of return of 34%, with a payback of 2.5 years.

Capital Expenditure
$230-million.

Planned Start/End Date
A final investment decision is expected in late 2024. Uranium production is planned within 18 months of the decision.

Latest Developments
Exploration drilling is under way to expand mineral resources beyond the current 59-million pounds of uranium, with a defined Tiris East exploration target of an additional 8- to 32-million pounds of uranium.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Aura Energy, tel +61 3 9101 8551 or email info@auraenergy.com.au.