Name and Location
Ngualla rare earths project, Tanzania.
Client
Peak Resources.
Project Description
A revised scoping study on Ngualla has increased the project’s total mineral resource from 8.2-million tonnes at 4.35% in the December 2012 scoping study, to 21.6-million tonnes at 4.54% rare-earth oxides.
Value
The capital cost has been reduced to $373-million, excluding contingency.
Duration
Production start-up is expected in 2016.
Latest Developments
The increased size of the mineral resource has allowed Peak to examine the economic benefits of doubling the base production rate to 20 000 t/y of contained rare-earth oxide.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.