https://www.miningweekly.com

Zim lithium, tantalum prospect returns ‘excellent’ test results

21st July 2017

By: Ilan Solomons

Creamer Media Staff Writer

     

Font size: - +

Diversified exploration and mining company Premier African Minerals reported “excellent results” from the initial metallurgical testwork study, which was completed by German materials testing and analysis company Dorfner Anzaplan on its wholly owned Zulu lithium and tantalum project, in Zimbabwe, last month.

Premier chairperson and CEO George Roach says that the company will undertake additional testwork to improve not only the recoveries of lithium and associated minerals, but also flow sheet design, as well as ascertain capital and operating costs for producing lithium from Zulu.

He notes that the best flotation testwork on spodumene pegmatite achieved an overall lithium recovery of 81.8% and a concentrate containing 6.5% lithium oxide and 0.09% iron oxide. Roach states that this is well within the typical range of spodumene concentrates for glass and ceramics, as well as for feedstock for conversion into lithium carbonate.

He remarks that the best flotation testwork on a mixed pegmatite sample achieved a spodumene concentrate containing 5.9% lithium oxide, which is acceptable for spodumene concentrates as feedstock for lithium carbonate production, as well as a commercial-grade petalite concentrate containing 3.9% lithium oxide with an “exceptionally low” iron oxide content of less than 0.01% at an overall recovery in the concentrates of an estimated 70%.

Roach points out that the tailings of spodumene and petalite flotation contain very low iron oxide concentrations of about 0.01%, offering the potential for producing high-quality, low-iron feldspar and quartz as by-products for glass and ceramics applications.

Further metallurgical testwork is planned, including tests on the recoveries of lithium-bearing minerals, the recovery of saleable tantalite concentrates and high-purity, low-iron oxide quartz and feldspar concentrates, as well as an optimised flow sheet design.
Dorfner also recommends a testwork programme for lithium extraction to produce lithium carbonate and hydroxide to prove that marketable lithium carbonate and hydroxide can be produced.

“The metallurgical testwork results and the recently announced maiden inferred mineral resource estimate at Zulu of 20.1-million tons grading 1.06% lithium oxide on only a part of the 3.5 km strike length of the Zulu project again confirm that the Zulu project has all the hallmarks of a world-class lithium project,” Roach concludes.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION