Vista granted enviro permitting
PERTH (miningweekly.com) – ASX-listed Titan Minerals has received environmental permitting for its Vista gold plant and mill, in Peru.
The company told shareholders on Wednesday that with the environmental approval now in place, the plant was ready for physical inspection by the Direccion Regional De Energia Y Minas for an operator’s permit.
The inspection would take a minimum of ten days to complete.
Once the operator’s permit is received the plant will be fully permitted and licensed to start commercial production, with commissioning expected over the coming month.
“We are very pleased to have received environmental approval from the provincial mines department so soon after finishing the construction of the plant,” said Titan executive chairperson Matt Carr.
“Dry commissioning of the plant is well under way for equipment testing associated with pending inspections, and lower-grade stockpiles on hand for commencement of wet commissioning in the coming weeks, once the operating permit has been received.”
When fully commissioned, the Vista plant will have a nameplate capacity of 150 t/d, more than tripling the operating capacity of the existing Tulin plant. At nameplate capacity, Vista is expected to generate up to 90 oz/d based on monthly average grades of 17.5 g/t to 24.4 g/t at the Tulin plant, over the past six months.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation