Updated study cuts Wiluna’s projected costs
PERTH (miningweekly.com) – An updated scoping study for the Wiluna uranium project, in Western Australia, has reduced the potential capital cost from A$91.6-million to A$87.9-million.
Projected operating costs have also been reduced from A$16.08/lb of uranium dioxide (U3O8), to A$14.59/lb.
Toro said on Thursday that the updated study also pointed to potential improvements in the overall uranium recovery from the plant to 82.77%, up from the 80.25% estimated in the original 2016 scoping study.
The updated scoping study incorporated opportunities highlighted by testwork completed as part of the beneficiation and process design studies that Toro has been undertaking since the completion of the initial scoping study.
The Wiluna project is expected to produce at a rate of about 1.3-million tonnes a year over a 16-year mine life, producing 30.1-million pounds of U3O8 over that period.
Mining will be undertaken from the Centipede, Millipede, Lake Maitland, Lake Way, Dawson Hinkler and Nowthanna deposits.
Comments
The
functionality
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation