https://www.miningweekly.com

Union at Colombia's Cerrejon votes to strike, mine seeks deal

29th January 2018

By: Reuters

  

Font size: - +

BOGOTA – The largest union at Colombia's top thermal coal mine Cerrejon has voted to strike following failed salary and benefit negotiations with the company, the union said on Monday.

Cerrejon accounts for 37% of Colombia's coal output, the world's fifth-largest exporter of the mineral, and a strike is likely to affect exports. The stoppage could begin within three days, the union said.

The two sides returned to talks on Friday, but no deal was reached and Monday was the end of a ten-day voting period during which union members could decide whether to stop work or take the matter to a tribunal. Some 3,399 union members voted for a strike and 19 for a tribunal, while 17 votes were void or blank.

The company, equally owned by BHP Billiton, Anglo American and Glencore, has offered a 2018 salary increase of 5.9%. The union originally demanded 12% and increased health and education benefits.

"The majority of unionised workers at Cerrejon voted in favour of the strike. If the company does not improve its offer we won't have any alternative but to strike because there isn't progress in the talks," Aldo Amaya, president of the Sintracarbon union, told Reuters.

The union says it represents some 4 000 of the company's 5 000 workers.

Cerrejon said its negotiators would re-double their efforts to reach a "realistic and prudent" deal with the union before the possible start of a strike this week.

"The company aspires to reach a transparent accord at the negotiating table, so we can proceed to sign a new collective contract before the deadline," Cerrejon said in a statement.

Production and exports at Cerrejon fell for a third straight year in 2017, when it mined 31.7-million tonnes of coal, as heavy rainfall affected operations, the owners said this month.

Coal is Colombia's second most important export.

The last strike at Cerrejon, which produces coal at its open pit mine in northern La Guajira province, was in February 2013 and lasted 32 days.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION