https://www.miningweekly.com

Tronox mulls expansion options as new R3.3bn KZN mineral sands mine opens

29th April 2016

By: Martin Creamer

Creamer Media Editor

  

Font size: - +

Heavy minerals mining company Tronox last week officially opened its new R3.3-billion Fairbreeze mine, in KwaZulu-Natal.

This is the latest mine of the NYSE-listed Tronox, headed by chairperson and CEO Tom Casey, who said the company was also considering a related beneficiation expansion, which would involve an additional investment of more than R1- billion.

The main product of the mine situated near Mtunzini, 45 km south-west of Richards Bay, is titanium dioxide, most of which will be supplied to Tronox’s own US, Dutch and Australian plants producing pigment, an ingredient of paint and plastics.

Two hundred and fifty direct jobs and another 1 000 indirect jobs have been created. At the peak of the mine-building project, there were 1 200 workers on site.

The JSE-listed Exxaro, headed by CEO Mxolisi Mgojo, has a 45% shareholding in Tronox and is the company’s 26% South African empowerment partner.

Tronox also operates South Africa’s Namakwa mineral sands operation and benefits from a vertically integrated suite of mines, smelters and pigment plants.

The first R2.6-billion phase of the operation just opened will provide an initial mine life of six years and will be followed by a second six-year phase at a total cost of R3.3-billion.

Hydraulic monitors are used to process the fines operation, run by Tronox South Africa GM Neels Oosterhuis.

Large volumes of water are recovered at Fairbreeze, which replaces the now-rehabilitated Hillendale operation that was closed in 2013.

Tronox VP Robbie Gleimuis reported that construction of Fairbreeze, which came in two months early and on budget, began in 2014 and produced its first product in December.

Gleimuis outlined how the idea of building the mine was first conceived by the former State steel company Iscor, which was searching for vanadium and came across ilmenite instead.

“So it has actually taken us 25 years to get to this point,” he added.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION