https://www.miningweekly.com

Trevali exploration uncovers ‘tangible’ near-term value at Santander

22nd March 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Canadian base metals miner Trevali Mining has expanded the Magistral zones at its flagship Santander zinc mine, in Peru, after the results of outstanding exploration drill holes from its 2015 exploration programme returned multiple high-grade zinc/lead/silver drill intercepts.

“Results from our 2015 exploration drill programme added very tangible, near-term value to our Santander operations. The modest planned 2016 exploration drill programme will seek to expand on these successes in addition to testing the deeper extents of the Magistral Central-Fatima zones,” stated president and CEO Dr Mark Cruise on Tuesday.

TSX- and Lima-listed Trevali’s 2015 exploration programme tested the deeper levels below the currently defined resources of the Magistral deposits, and the majority of the drill holes intersected zinc grades materially higher than those in current mining operations.

Exploration highlights included 11.2 m of 9.2% zinc and 1.4 oz/t silver at Magistral South-Central; 31 m of 6.5% zinc at Magistral South; and 19.3 m of 4.3% zinc, 1.99% lead and 3.5 oz/t silver at Magistral North.

The three Magistral deposits all remained open for expansion and the company believed that there was “very significant” resource potential remaining in all three zones where limited down-dip drilling had occurred.

Meanwhile, Trevali was focused on the ongoing commissioning and ramp-up of its Caribou zinc mine, in New Brunswick. Just last week the company had closed a C$14.95-million public offering to fund working capital for the project and to cover general corporate expenses.

Trevali had recently reported that, following zinc circuit modifications undertaken late-December and early January to the Caribou mill, year-to-date performance was exhibiting improved availability, utilisation, throughput and stability on a daily basis to achieve an average throughput of about 2 707 t/d in February. Importantly, the overall process inconsistency continued to decrease on a month-to-month basis.

Trevali planned to report its full-year 2015 financial results after market close on March 30.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION