https://www.miningweekly.com

Tongon mine output to near FY guidance despite efficiency losses

27th October 2014

By: Natalie Greve

Creamer Media Contributing Editor Online

  

Font size: - +

JOHANNESBURG (miningweekly.com) – The remedial measures implemented to overcome the technical problems that have impacted the Tongon mine, in Côte d'lvoire, were starting to produce the desired results, with the mine's performance improving, Randgold Resources CEO Mark Bristow said on Monday.

In a media release following a briefing with Côte d'lvoire media, he indicated that mill throughput and the recovery rate – the two chief challenges faced by the operation – were both improving as a result of a “determined effort” by the Tongon management team. 

Their action plan included the replacement of the faulty crushers, with the new crushers currently being integrated into the larger circuit, as well as the expansion of the flotation circuit, which would start when the necessary equipment arrived on site next month.

“By early next year, Tongon should have achieved its targeted performance levels, but the improvement is already evident and, despite the setbacks and challenges the management team has had to contend with, the mine should come within 10% of its production guidance of 260 000 oz for 2014, with costs well contained,” Bristow outlined.

In the meantime, he said, infill drilling at the mine's south pit had confirmed the potential for increasing the resource and the mineable reserve to replace ounces depleted during the year. 

Elsewhere in Côte d'Ivoire, Randgold had acquired two new permits, while more were pending. 

Owing largely to the confidence inspired by the country's new mining code, Bristow said the group would be stepping up its investment in exploration in the country.

To watch Creamer Media's latest video reports, click here
 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION