https://www.miningweekly.com

Testwork confirms DMS applicability at Cradle Arc’s Botswana copper mine

31st January 2018

By: Anine Kilian

Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – An independent test report from inspection, verification, testing and certification company SGS South Africa, has detailed grading analysis sampling results and confirmed the applicability of dense media separation (DMS) at Aim-listed Cradle Arc’s flagship asset, the Mowana copper mine, in Botswana.

DMS is considered a low capital expenditure expansion option to potentially increase production at Mowana to about 22 000 t/y of copper in concentrate and could increase throughput to about 2.6-million tonnes a year.

Testwork has demonstrated that DMS preconcentration can be deployed at Mowana on all low-oxide ores.

Based on the outcome of this testwork, Cradle Arc intends to move forward with a development plan for the upgrades to the Mowana processing plant. 

“Our expectation that DMS upgrades should be deployed at Mowana has been confirmed by SGS’s report.  We are now focused on working closely with our selected contractors to finalise the budget and implement the strategy to upgrade the processing plant,” CEO Kevin van Wouw said in a statement on Wednesday.

He added that this would dramatically improve cash flows and the project’s net present value.

“Concurrent with this work, we are generating a new block model for the resource at Mowana, which will allow us to complete new mining schedules incorporating these results, as well as the additional knowledge gained from our re-logging exercise. We expect both work streams to be completed during this quarter, allowing the upgrade project to move forward expeditiously.”

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION