Test results support Cadoux project’s HPA flowsheet
JOHANNESBURG (miningweekly.com) – Metallurgical tests conducted as part of the prefeasibility study (PFS) at ASX-listed FYI Resources’ Cadoux Kaolin project, in Western Australia, have validated the high-purity alumina (HPA) flowsheet for the project.
The outstanding metallurgical test results returned excellent leach extractions of up to 97.2% aluminium oxide. The combination of achieving 99.99% grade at a 97.2% recovery demonstrates Cadoux as being an ideal feedstock and validates the HPA flowsheet being designed and tested under the PFS, said FYI MD Roland Hill.
“FYI had accomplished the key proof of concept for the HPA strategy by achieving a purity of 99.99% alumina. The success of the strategy has now overwhelmingly been demonstrated with the achievement of 97.2% extraction of leached product.
“Rapid leach kinetics indicate an excellent metallurgical response to feedstock, leach results demonstrate ideal selective leaching of aluminium and the impressive leach recovery results based on the use of atmospheric pressure and low temperatures is very encouraging and provides the framework for favourable project economics in terms of capital costs and operating costs,” he added
FYI stated that Cadoux continues to demonstrate amenability and suitability to the production of commercial HPA using conventional processing techniques and equipment.
“We look forward to progressing the current PFS work and anticipate further positive results increasing our confidence that commercial HPA can be generated from the high-grade kaolin at Cadoux.
“The ongoing metallurgical test work is designed to understand leaching outcomes over a series of variables including feedstock variances, varying operating temperatures and leach durations to determine optimal recovery and operating ranges,” Hill concluded.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation