https://www.miningweekly.com

South32 turns its eye to Mexico

5th June 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Diversified miner South32 has signed an agreement with Canada’s Silver Bull Resources that could result in a $100-million investment in a Mexican zinc project.


The TSX-listed Silver Bull has granted South32 the option to form a 70/30 joint venture (JV) over the Sierra Mojada project. The diversified miner would be given a 70% interest in the project in exchange for a $100-million subscription in Silver Bull subsidiary Metalin, which owns the zinc project.


To maintain the option in good standing, South32 will be required to contribute a minimum of $10-million in exploration funding during a four year period, with a minimum aggregate exploration funding of $3-million, $6-million and $8-million to be made at the end of years one, two and three of the option period, respectively.

Silver Bull president, CEO and director Tim Barry told shareholders that the transaction with South32 validated the company’s significant success in identifying high-grade sulphide zones at Sierra Mojada.

“South32 is a globally diversified metals and mining company that will bring funding and significant technical expertise to the project. We believe this agreement recognises the significant potential at the Sierra Mojada project.”

The project is currently estimated to have a measured and indicated resource of 58.7-million tonnes, grading 3.6% zinc and 50 g/t silver, for 4.67-billion pounds of zinc and 90.8-million ounces of silver.

South32 recently signed a conditional agreement to acquire a 50% interest in the Eagle Downs metallurgical coal project, in Queensland, for an initial $106-million up-front payment. A further $27-million will be payable three years after the transaction, along with a production royalty that will be capped at $80-million.

The company in April also signed an earn-in agreement over the Greater Riqueza multi-metals project, in Peru.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION