https://www.miningweekly.com

South32 says Illawarra output to fall to 4.5Mt in FY18

5th December 2017

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Diversified miner South32 has given a production guidance for its Illawarra metallurgical coal operation, where the Appin colliery was suspended for about four months this year owing to concerns about a potential gas breach.

The New South Wales-based Illawarra operation, which comprises the Appin and Dendrobium mines, is expected to produce 4.5-million tonnes in the 2018 financial year, down from 7.1-million tonnes in the 2017 financial year, ASX-, LSE- and JSE-listed South32 reported on Tuesday.

Operations at Appin were suspended at the end of June and, by October, the New South Wales regulator allowed South32 to restart one longwall at the colliery. South32 reported that it expected Appin to return to its prior two longwall configuration in the December 2018 quarter, after which Illawarra’s production will return to historical rates of more than eight-million tonnes a year.

Operating unit costs of the Illawarra operation are expected to be significantly higher in the 2018 financial year, with South32 having provided a guidance of $130/t, compared with $80/t in the 2017 financial year and $61/t in the 2016 financial year.

The mining group also lowered its sustaining capital expenditure (capex) guidance for the 2018 financial year to $470-million, from an earlier forecast of $500-million, mainly owing to the deferral of underground development at Appin. Sustaining capex for Illawarra is forecast to be $120-million in the current financial year, compared with $150-million previously forecast.

Meanwhile, South32 also reported that it was studying the potential to unlock high-quality coal resources at Dendrobium. It is assessing Area 5 and Area 6 and will complete a prefeasibility study in March next year.

Environmental and community impact assessments have already started.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION