https://www.miningweekly.com

Sierra Metals plans 66% production expansion at Peru mine

29th June 2018

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Toronto-based Sierra Metals has delivered a preliminary economic assessment (PEA) for a 66% production expansion at its Yauricocha base and precious metals mine, in Peru.

The production expansion will expand the Yauricocha mine through stages from its current 3 000 t/d to 3 600 t/d in the first quarter of 2019, followed by a capacity upgrade to 5 500 t/d in 2021.

“The expansion adds to the value of our resources by accelerating its production timing and also adds to the potential value to future resource increases, which we expect to continue due to the on-going aggressive exploration campaign at the mine," Sierra Metals president and CEO Igor Gonzales said this week.

The expansion is supported by a positive PEA, which returned a net present value of $393-million, at an 8% discount rate, and a return on investment of 486%. The after-tax payback period will be 4.1 years.

Based on ten years of mining the existing mineral resource, the expanded Yauricocha mine will deliver 621.1-million pounds of payable zinc output.

The life-of-mine capital cost is estimated at $238-million and after-tax cash flow of $532-million.

“The expansion of our capacity is a natural step that follows mineral resources increases in recent years. The expansion adds to the value of our resources by accelerating its production timing and also adds to the potential value to future resource increases, which we expect to continue due to the on-going aggressive exploration campaign at the mine," said Gonzales.

The Yauricocha mine processed 271.39-million tonnes of ore in the March quarter, delivering 366 000 oz of silver, 3.73-million pounds of copper, 6.07-million pounds of lead, 18.14-million pounds of zinc and 835 oz of gold.

The Yauricocha expansion study follows the recently announced expansion of the Cusi mine, in Mexico. The company plans to do a PEA for an expansion at the Bolivar mine, also in Mexico.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION