https://www.miningweekly.com

Serabi off to a good start with January production of 3 671 oz

13th February 2019

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

Aim- and TSX-listed Serabi Gold has set its 2019 production guidance at between 40 000 oz and 44 000 oz, with 3 671 oz already produced in January.

CEO Mike Hodgson said in a statement on Wednesday that the step up from the production levels achieved in 2017 and 2018 will be driven by improved efficiencies in both orebodies and the processing of about 40 000 t of flotation tails, grading 3 g/t gold, which will supplement the normal run-of-mine production.

The company has commissioned a scrubber, or independent trommel feed system, which was started on January 10, and has worked well, allowing the already milled tailings to be fed directly to the cyanidation plant, therefore not consuming valuable capacity in the milling section of the processing plant.

Serabi is awaiting an ore sorter that has been shipped to Brazil.

Meanwhile, Serabi is close to concluding a drill programme at its Coringa project, in Brazil, with a geological resource update and a preliminary economic assessment to be published in March and June, respectively.

“In light of recent events at Brumadinho in Minas Gerais state, in Brazil, I would like to give reassurance to our stakeholders regarding the tailings management facility at Palito. Serabi’s operations are all about quality not quantity, therefore, we mine and process almost insignificant volumes of rock relative to industrial mineral, iron-ore and bauxite operations such as Brumadinho. 

“New legislation has been introduced following the dam failure at Mariana, also in Minas Gerais, in 2015. This legislation has, however, been a rather ‘one size fits all’ approach, and as a result we do have a highly ‘over-engineered’ tailings facility and the annual audit of our tailings facilities, undertaken late last year by an accredited Brazilian geotechnical engineering expert, confirmed our tailings management facility to be in good order, and it remains fully licensed and certified,” Hodgson averred.

The company was expecting further tightening of legislation post Brumadinho, and earlier this week the government, through the National Mining Agency, moved to ban all upstream tailings dams. 

“Such a move would not affect the safety and legality of our tailings facility which, firstly, comprises small ponds, rather than dams and, secondly, is not upstream of any nearby population,” said Hodgson.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION