https://www.miningweekly.com

ScoZinc expects upcoming PFS to improve past Scotia assessments

11th February 2020

By: Creamer Media Reporter

     

Font size: - +

TSX-V-listed explorer and developer ScoZinc is hopeful that when it announces the results of a prefeasibility study (PFS) for the idled Scotia mine, near Halifax, it will be an improvement on past assessments.

The company confidence levels are boosted by the recent doubling of the mineral resource estimate for the historic zinc/lead mine and Ausenco Engineering Canada’s completed review of the processing operations.

Ausenco’s processing trade-off technical study has determined that the mill contained a number of production and maintenance bottlenecks, the removal of which will contribute to increasing the efficiency of the mill.

Ausenco also identified a number of low-cost improvements that could be made during a relatively short refurbishment period to de-risk the processing operations.

“Ausenco’s detailed review of our processing operations over the last few months has confirmed our strategy that a low mill refurbishment cost is realistic and achievable within a reasonable time frame. Combined with the recently announced new mineral resource estimate, which almost doubled the Scotia Mine’s mineral resources, we are encouraged that the upcoming PFS will be a significant improvement on the past preliminary economic assessments (PEAs),” comments ScoZinc president and CEO Mark Haywood.

A December 2018 PEA for the historic zinc/lead mine, in Nova Scotia, calculated that restart capital of C$27-million will be required. The mill will operate on a 3 000 t/d basis for 6.4 years, delivering 325-million pounds of zinc and 185-milllion pounds of lead over this time.

The results of the PFS will be announced at the end of next month and are expected to support the company’s view that Scotia has the potential to be a “long-term low-cost openpit base metals producer”.

The project has total measured and indicated resources of 25.45-million tonnes at a zinc-equivalent grade of 2.84% and total inferred resources of 5.01-million tonnes at a zinc-equivalent grade of 2.13%.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION