https://www.miningweekly.com

Sanbrado set for early start

13th February 2020

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed West African Resources has completed the commissioning of the primary crusher at its Sanbrado gold project, in Burkina Faso, ahead of schedule.

First gold production has now been brought forward, and is expected early in the second quarter of 2020, instead of the third quarter, as previously scheduled.

“We are very pleased to have crushed the first M5 openpit ore ahead of schedule at Sanbrado. The overall construction project is tracking ahead of schedule, which is a credit to the skills and experience of West African Resources’ team and the quality and cooperation of the contractors and consultants working with us on the build,” said executive chairperson Richard Hyde.

“Double shift openpit mining has recently started with over 200 000 t of oxide ore now on the run-of-mine pad. Commissioning activities are also progressing well, with the project now tracking towards an early second quarter maiden gold pour.”

Meanwhile, underground development is also continuing to progress to schedule, and first development ore is on track for late March, while the first stoping ore is forecast for the third quarter of this year.

The $185-million Sanbrado project is currently expected to produce an average of 211 000 oz/y of gold over the first five years of operation, with production averaging 133 000 oz/y over the 11-year life-of-mine.

Edited by Creamer Media Reporter

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION