Samarco is said to be nearing settlement with Brazil prosecutors
RIO DE JANEIRO – After a year of back and forth, the owners of the idle Samarco iron-ore mine are close to signing a definitive settlement with Brazilian prosecutors that will clear the way for restart preparations and debt talks to begin, according to people briefed on the matter.
Joint venture partners Vale SA and BHP Billiton have already secured four court extensions to negotiate the settlement of a multibillion-dollar claim stemming from a fatal tailings dam disaster in 2015.
This time the two sides are on track to meet the deadline, which now stands at June 25, the people said, asking not to be identified because talks are private. Final details probably will be ironed out in the coming days, including a request by prosecutors to have community representatives on the board of a foundation that administers ongoing reparations, the people said.
The prosecutor’s office had no comment. The press departments of Vale, BHP and Samarco declined to comment.
The settlement would bring together two separate claims: 155-billion reais ($41-billion) sought by federal prosecutors and 20-billion reais sought by the southeastern state of Minas Gerais in a civil suit.
Resolving the legal cases will allow talks with creditors to begin as the company starts to draft its long-term business plan, although any restructuring deal would still require a firm restart date, the people said. Vale’s best case is a limited restart in the first half of 2019. Wood Mackenzie predicts 2020.
In a note to clients Wednesday, Exotix reiterated a buy rating on Samarco bonds, predicting a fine that’s in line with the venture’s future ability to pay.
"We expect them to seek not to jeopardize Samarco’s future operations and/or profitability, and allow it to become profitable enough to take care of bondholders and other creditors," wrote Rafael Elias, a director for Latin American research at Exotix.
Samarco notes due 2022 trade at about 66c on the dollar, down from a peak of 80c in January. Without a restart, they are worth zero, said Patrik Kauffmann, who helps manage $11-billion in assets at Solitaire Aquila in Zurich.
In December, Samarco obtained permits to use the Alegria Sul pit for depositing waste, but has held off preparatory work until settling with prosecutors. Other restart permits are pending.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation