Rio Tinto's US copper smelter restarts, force majeure remains
Global miner Rio Tinto restarted the smelter at its large Kennecott mine in the United States last Friday after a nearly six-week outage, but force majeure on refined copper has not yet been lifted, a company spokesman said on Monday.
There was no timeline for when the force majeure would be lifted, spokesman Kyle Bennett said. A force majeure is usually implemented by companies during unforeseen events when they cannot meet commitments to customers.
Rio Tinto halted production of refined copper at its smelter at the Utah-based mine on October 8 after a worker was exposed to sulfur dioxide gases at the plant while removing debris from a boiler. The worker died two days later.
Mining and milling operations had continued while the smelter was down, with ore being stockpiled for later processing, Bennett said.
"Everything's running normally," Bennett said via telephone, adding that the company had put in place a number of additional controls and offered more training after the incident.
Rio Tinto Kennecott comprises nearly 20% of US copper production. The unit produced 156 500 t of refined copper in 2016, about 63% of group output.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation