https://www.miningweekly.com

PTM pushes Waterberg resources limit 3.4 km northwards

20th April 2015

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Vancouver-based Platinum Group Metals (PTM) has extended the northern limit of the known Waterberg Extension deposit, on the northern limb of South Africa’s Bushveld Igneous Complex.

PTM on Monday announced that new intercept WE 049 was located 3.4 km northward beyond the previous resource limit. The deposit remained open, beyond the current strike length, for further expansion and all of the intercepts would be considered in the resource update planned shortly.

Independent compliant resource calculations and peer reviews were in progress on the deposit.

Step-out intercept WE 049 was significant as it further established the open potential northward along strike on the Waterberg Extension property, where PTM held an effective 87% interest.

The Waterberg deposit had been divided into the Waterberg I, II, III domains. Each domain represented about 5 km of strike length, with the initial engineering work at Waterberg covering Waterberg I.

The current resource at Waterberg, before the update in progress, was 29-million ounces over about 10 km of strike length, comprising on a 100% basis an inferred resource of 287-million tonnes, grading 3.15 g/t 4E – 0.94 g/t platinum, 1.92 g/t palladium, 0.04 g/t rhodium, 0.25 g/t gold, comprising a ratio of 30%, 61%, 1% and 8% respectively.

PTM said geophysical modelling suggested an extension target at Waterberg III for 5 km and further north.

The company had, to date, completed 71 000 m of largely fill drilling since the last resource estimate. One drill continued to prospect the open strike and dip lengths looking for the best palladium and platinum grade and thickness at Waterberg.

A first priority for Waterberg this year would be to complete the resource update by May, including recent drilling, followed by prefeasibility study (PFS) results in mid-2015.

Engineering firm DRA was working on completing the PFS, which was funded by PTM and Waterberg Joint Venture partner Japan Oil, Gas & Metals National Corporation.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION