https://www.miningweekly.com

Polymetal ups stake in ‘perfect fit’ Nezhda deposit

17th July 2017

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Encouraged by the recently published resource estimate for the Nezhdaninskoye gold deposit, in Yakutia, Russia, LSE-listed Polymetal has decided to increase its shareholding in the joint venture (JV) project to 24.7%, with an option to acquire the remaining stake.

A new shareholder agreement has been negotiated, under which Polymetal will acquire an additional 7% share from its partner, Ivan Kulakov, for $8-million, which increases its interest to 24.7%.

A call option has also been agreed on, which will allow Polymetal to acquire the remaining 75.3% in Russia's fourth-largest gold deposit.

CEO Vitaly Nesis said on Monday that the new shareholder agreement will give Polymetal decision-making flexibility and offers the group a clear path to consolidating full ownership in the asset.

“Exploration at Nezhda confirmed a very large high-grade property with substantial openpit potential. The asset fits perfectly with Polymetal's core competencies in refractory ore processing and remote asset development,” he said in a statement.

The project has a measured, indicated and inferred mineral resource of 70.6-million tonnes at 4.7 g/t gold and 13 g/t silver, containing 10.7-million ounces of gold and 29.7-million ounces of silver, or 10.9-million ounces of gold equivalent.

Polymetal aims to publish an initial reserve estimate by the end of 2017.

Located in north-east Yakutia, in the Tompon district, Nezhda is considered remote with access by an all-season unpaved road, and no grid connection. The climate is characterised by long severe winters and short hot summers.

Polymetal currently envisions the construction of an openpit mine and a conventional concentrator on-site with concentrates processed at the Amursk pressure oxidation plant or sold to third party offtakers.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION