https://www.miningweekly.com

OceanaGold rises on improved 2017 outlook

13th December 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

VANCOUVER (miningweekly.com) – The TSX-listed stock of multinational gold producer OceanaGold on Monday rose as much as 3.54% to C$3.80 apiece following a company announcement stating that it had lifted expected 2017 output by 35% over the current year and reduced all-in sustaining costs (AISC) by 15%.

Melbourne, Australia-based OceanaGold said it expected to produce between 550 000 oz and 610 000 oz of gold, at an AISC of between $600/oz and $650/oz during 2017, up from a 2016 guidance of between 385 000 oz and 425 000 oz produced at an AISC of $700/oz to $750/oz.

The impetus for the improved outlook is the Haile gold project, in South Carolina, which OceanaGold acquired at the end of 2015 through the C$856-million acquisition of Canadian project developer Romarco Gold. Haile is nearing construction completion and wet commissioning.

The lower AISC profile is thanks to lower costs expected from the Didipio copper/gold mine and the inclusion of high-margin ounces from Haile.

“Looking to the year ahead, we are well positioned to generate significant free cash flow, even in a lower-gold-price environment. Our strategy to create a high-margin business from our portfolio of high-quality assets has been a successful one thus far,” stated president and CEO Mick Wilkes.

Meanwhile, OceanaGold also reported that its 2016 exploration programme demonstrated significant organic growth potential across its portfolio.

In particular, the company said it is sharpening its focus on North and South Carolina, where it is exploring for more Haile-like deposits.

Meanwhile, OceanGold is making progress regarding its exploration target Waihi, on New Zealand's South Island. The company's target is to discover a further one-million ounces of resource over the medium term.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION