https://www.miningweekly.com

New BC coking coal mine on the cards

13th November 2018

By: Creamer Media Reporter

     

Font size: - +

Publically traded Colonial Coal has announced the outcomes of a preliminary economic assessment (PEA) for a new coking coal mine, near Tumbler Ridge, in north-eastern British Columbia.

Although preliminary in nature, the PEA shows that the Gordon Creek project has positive economics and that it is worthy of continuing exploration and development, the TSX-V-listed company reported on Monday.

The study is based on a conceptual mine plan that targets 111.6-million tonnes of run-of-mine resource, with a yield of 57.4-million tonnes of coal over a mine life of 30 years. In full production, the mine will produce between 1.6-million tonnes a year to 2.6-million tonnes a year, averaging 1.9-million tonnes a year.

At a capital cost of $300-million for an underground mine, the Gordon Creek project will repay the initial capital investment in three years, Colonial stated.

The PEA delivered a net present value of $690.5-million, using a 7.5% discount rate, and an internal rate of return (IRR) of 24.4%, based on a weighted average coking coal price of $164.8/t and a premium pulverized coal injection coal price of $140.5/t.

Financial analysis suggests that the “break-even” coal price is less than $91.1/t, $96.5/t and $103.3/t for discount rates of 5%, 7.5% and 10%, respectively. It also indicates that for a 15% IRR, a minimum coal price of $119.9/t will be required.

The study calculated the overall weighted average price for all coal types at Gordon Creek to be $160.5/t.

The PEA assumed that the Gordon Creek project would be connected by road to the existing rail line south of Tumbler Ridge. The rail line would be accessed through a loadout located in the area of an existing coal loadout operated by Peace River Coal.  

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION