https://www.miningweekly.com

Millennium grows Nullagine reserves by 20%

26th February 2018

By: Creamer Media Reporter

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Western Australian gold miner Millennium Minerals has completed the first step in its strategy to establish a plus-five-year mine life at its Nullagine gold project in the Pilbara, with a 20% increase in ore reserves to 221 600 oz.

Following a 246 000 m drilling campaign in 2017, the company increased the project’s ore reserves to 221 600 oz, from 185 900 oz last year (net of mining depletion of 84 808 oz for the 2017 calendar year).

The average grade of the updated ore reserve has increased from 1.4 g/t to 1.67 g/t, reflecting the company’s continued focus on delineating larger, higher grade ore sources across the Nullagine project.

Total group mineral resources at December, net of mining depletion, stand at 22.80-million tonnes at 1.5 g/t for 1.12-million ounces, with about 65% of the total in the higher confidence measured and indicated categories.

Millennium CEO Peter Cash said in a statement on Monday that the company would take the second step in its strategy to establish a five-year life at Nullagine in the next quarter, when completion of the expansion study would pave the way for its entire mineral inventory to be reviewed.

“This is an interim upgrade based solely on the results of our extensive exploration programme last year – which once again was extremely successful in continuing to push out our mine life while replacing mined ounces,” he said.

“Our focus on aggressively growing our oxide reserves will continue this year but, at the same time, we are also on the cusp of being able to unlock our extensive sulphide mineral resource inventory, which is the company’s most significant asset.

“As soon as we complete the current Nullagine expansion study based on the recently outlined processing solution, we will be in a position to re-optimise our entire gold inventory and target the conversion of a significant portion of the large sulphide resource inventory to ore reserves – paving the way for a substantial increase in production and mine life.”

To watch Creamer Media's latest video reports, click here
 

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION