https://www.miningweekly.com

Metro Mining reaches commission stage at Bauxite Hills

29th November 2017

By: Megan van Wyngaardt

Creamer Media Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – ASX-listed Metro Mining on Wednesday reported that all major marine infrastructure at its Bauxite Hills mine had reached practical completion including the barge loading facility (BLF), marine offloading facility, cyclone moorings, navigational aids and tidal gauge.

The project is within budget and on time.

The BLF was recently wet commissioned with first product being loaded onto the conveyor system and into a barge. The commissioning was a success with the BLF construction completed in only five months.

In the lead-up to production, Metro will also commission the product sampling station and on-belt analyser, which are used to support mining operations, specifically quality control.

“[This was] a fantastic effort to get the major items of infrastructure complete, and commissioned, in this timeframe. A special thanks must go to Transhipment Services Australia, who were the project managers for the BLF and marine infrastructure, for a job well done.

“We are becoming increasingly excited about next year, and are confident we will be in production, as we have promised, early in the second quarter of 2018,” Metro Mining MD Simon Finnis said.

The company added that the camp, fuel farm and other infrastructure remained on track for completion by the end of the year.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION