https://www.miningweekly.com

Metal Tiger, MOD to start drilling campaign at Botswana project

15th May 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Natural resource investor Metal Tiger on Tuesday said a significant drilling campaign is starting at the T3 Dome Complex at the company’s 30%-owned joint venture project with MOD Resources in the Kalahari copperbelt, in Botswana.

This follows the completion of the public review of the environmental management plan for the project last month.

The drilling will initially entail seven buried conductive domes – comprising 60 diamond drill holes planned for Phase 1, with four drill rigs deployed. The domes are generally more than 5 km long and about 1 km to 2 km wide.

The drilling will be used to confirm the prospective geological sequence and structures that occur within the interpreted domes.

The tops of several domes have been interpreted to start from 50 m to 100 m below surface, other domes start at 200 m to 300 m depth and are less well defined.

Drilling is currently under way at A4 Dome, 8 km west of the T3 deposit, as well as at A1 Dome, 20 km northeast of T3.

The T3 Dome is described as a complex, owing to a number of targets being identified within its 1 000 km2 circumference.

Airborne electromagnetic geophysics interpretation points to a series of large conductive domes, spread over a wide area, with similar geometries and internal structures to T-Rex Dome, which underlies the T3 deposit.

Metal Tiger CEO Michael McNeilly commented that, with cross-sectional profiles similar to the T-Rex Dome, the feature associated with the T3 Deposit, these new domes will now be drill tested to confirm that they coincide with the favourable geological units and structures associated with the T3 mineralisation.

“This new drilling programme has the potential to deliver a pipeline of exciting results and hopefully additional T3 type deposits,” he added.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION