https://www.miningweekly.com

Maiden resource for Orion’s Prieska project

5th February 2018

By: Anine Kilian

Contributing Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – The maiden mineral resource for dual-listed base metals company Orion Minerals’ Prieska zinc/copper project has exceeded expectations.

The company on Monday announced a maiden mineral resource of 24.2-million tonnes, containing 873 655 t of zinc and 297 129 t of copper, for the Northern Cape project.

CEO Errol Smart said in a statement that the Prieska project demonstrated the value of modern exploration techniques and methodology applied to high-quality, under-explored deposits.

“As we intensify our regional exploration, having recently completed a regional airborne electromagnetic survey, we are confident of success in making further major discoveries in the Areachap belt,” he said.

Orion has now completed about 42 000 m of drilling on the deep sulphide target and has succeeded in validating extensive historic data for inclusion in geological modelling and geostatistical estimation.

Orion anticipates that the additional holes will provide satisfactory drill spacing to delineate mineral resource estimates with an increased level of confidence as early as next quarter.

This will allow inclusion of these mineral resources in detailed scheduling and mine design work as possible sources of feedstock for early production, potentially enabling the delineation of a maiden ore reserve.

The openpit target resource presents an interesting early production opportunity for consideration in the bankable feasibility study (BFS). Orion reported that early mining of an openpit could bring forward production, while mine dewatering was under way.

“With engineering studies and metallurgical optimisation progressing well, Orion is very confident of a positive outcome for the BFS currently under way.”

Further drilling will be carried out during the first half of 2018 to upgrade the confidence classification of a substantial portion of the global mineral resource.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION