https://www.miningweekly.com

Lonmin launches community grievance system

25th April 2018

By: Marleny Arnoldi

Deputy Editor Online

     

Font size: - +

JOHANNESBURG (miningweekly.com) – Platinum producer Lonmin has introduced a community grievance mechanism called Buang Le Rona/Thetha Nathi, meaning ‘Talk to Us’.

The mechanism was started last year with a pilot project and Lonmin stakeholder engagement and regulatory affairs executive VP Thandeka Ncube on Wednesday expressed her excitement with the company launching a full-service grievance system.

The system is aimed at improving two-way communication between communities and Lonmin and resolving grievances within the greater Lonmin community.

Ncube explained that the system came about as a result of the introduction of an internal policy based on global best practice and international principles.

“We made it a point to ensure that grievances and conflicts are mediated in a transparent and fair manner and, most importantly, this system will be able to track the progress of a grievance until it is resolved by the responsible stakeholder, whether an internal Lonmin department or an external stakeholder,” she added.

To ensure maximum impact and awareness of the mechanism, Lonmin has invested in an awareness campaign to educate community members and employees on how they can access the system and submit a grievance.

The system also affords the community the opportunity to submit a grievance at face-to-face meetings with the Lonmin stakeholder team at their scheduled engagements, a hotline staffed by consultants who are conversant in IsiXhosa, Setswana and English, comments/suggestion boxes in the community and through letters that can be delivered by hand or emailed to the Lonmin community office.

Comment boxes will be emptied once a week and the comments will be loaded onto a grievance Isometrix system – an internal online system that will be used to track and monitor progress to resolve grievances received.

“The system is only as good as the people who use it, and we hope that through this mechanism, Lonmin will be able to resolve issues speedily,” concluded Ncube.

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION