https://www.miningweekly.com

Korab gets export capacity at Darwin

8th November 2017

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Diversified explorer Korab Resources has inked a non-binding heads of agreement (HoA) with the Darwin Port operator to export some 500 000 t/y of magnesite rock through the port.

The HoA included sub-leasing of the land, access to various port facilities, the use of loaders and other equipment, and provided the basis for the final port agreement that would allow for exporting the magnesium carbonate rock through Darwin.

“This is a major milestone in the process of commercialisation of the Winchester magnesium carbonate deposit,” Korab chairperson Andrej Karpinski said on Wednesday.

A 2015 prefeasibility study into the Winchester project estimated that the project would require a capital investment of about A$4-million to produce 800 000 t/y over a mine life of 14 years, to generate an aggregate earnings before interest, taxes, depreciation and amortization of A$395-million.

Based on a mineral resource estimate of 12.2-million tonnes of magnesite rock, production is expected to start at 200 000 t/y of saleable magnesite rock in the first year of operation, increasing to 800 000 t/y by year three.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION