https://www.miningweekly.com

Klondex lifts resource models at both Nevada assets

16th September 2015

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

TORONTO (miningweekly.com) – Canadian gold producer Klondex Mines has increased the resource models for both its Fire Creek project and its Midas mine, in northern Nevada.

The TSX-listed miner on Wednesday reported that as of June 30, the Fire Creek deposit’s National Instrument 43-101-compliant measured and indicated gold-equivalent (AuEq) ounces rose by 52 800 oz to 473 300 oz, up 13%, net of depletion.

The inferred AuEq resource increased by 78 200 oz to 441 500 oz, up 22%, net of depletion.

Further, as at May 31, Midas’s compliant measured and indicated resources increased by 35 600 AuEq ounces to 561 600 oz, up 7%, net of depletion.

The inferred resource decreased by about 8%, or 19 500 oz, to 267 500 AuEq ounces, net of depletion.

"I am pleased that our 2015 exploration and development programmes are performing as expected [to justify investment in] the necessary capital to replace depletion and extend the mine life of our assets [yearly]. We are just beginning to understand the true potential of these assets, particularly at Fire Creek where about 93% of our land package remains untested,” president and CEO Paul Huet stated.

He noted that exploration at both properties was ongoing, providing upside potential as the company continued to unlock the true potential of these deposits.

The Fire Creek mineral resources were based on 836 drill holes totalling 176 934 m and included data from 147 new drill holes totalling 15 050 m, which were completed by Klondex in 2015. The mineral resource estimate also used 2 322 channel samples provided from mining on the structures.

The Midas mineral resources were based on 4 248 drill holes totalling 869 830 m and included data from 145 new drill holes totalling 25 984 m completed so far this year. The mineral resource estimate also used 19 351 channel samples provided from mining on the structures.

Klondex’s milling and processing facilities, which were located at Midas, processed ores from both Midas and Fire Creek, about 160 km south of Midas.

Edited by Tracy Hancock
Creamer Media Contributing Editor

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION