https://www.miningweekly.com

Intrepid looks at new options for Kitumba as Weatherly deal lapses

21st May 2018

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Intrepid Mines on Monday said that it was considering alternative options for its Zambian assets, given the current copper price environment.

The announcement comes after the Zambian Ministry of Mines and Minerals Development’s conditional approval for the sale of Intrepid’s Zambian assets to Aim-listed Weatherly International lapsed on May 18.

Weatherly in December  announced that it would acquire the Kitumba copper project from Intrepid for A$4.75-million in cash.

However, Weatherly has had difficulty obtaining financing for the acquisition, after the company was unable to fund the acquisition through an existing debt facility with Orion Mine Finance Fund.

The advanced Kitumba copper development project hosts a Joint Ore Reserve Committee- (Jorc-) compliant measured and indicated resource of 24.9-million tonnes at a copper grade of 2.32% containing 578 000 t of copper. Included within this resource is a Jorc-compliant reserve of 21.9-million tonnes at a copper grade of 2.20% copper containing 492 000 t of copper.

The Kitumba deposit is contained within a granted mining licence that is valid until 2029, while the wider project area also includes four exploration licences, with a combined current mining and exploration tenure area covering more than 900 km2.

To date, an estimated $30-million or more has been spent on exploration, drilling, metallurgical testwork and other studies for Kitumba.

Edited by Creamer Media Reporter

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION