IC Potash expands New Mexico land package
TORONTO (miningweekly.com) – New Mexico-focused IC Potash (ICP), which is developing the Ochoa polyhalite potash project, on Wednesday said it had secured another 774.5 ha of land in Lea county, from the New Mexico state land office, increasing its total state lease and federal permit holdings in the region to about 41 075.5 ha spanning 410.7 km2.
"Based on findings of our original drilling programme, the additional land granted by the state has been determined to be strategically important for our Ochoa project, as it holds prospective mineralisation that could expand Ochoa's already significant resource base of Polyhalite,” ICP CEO Sidney Himmel said in a statement.
The new lease also covers land located about 500 m from the planned mine shaft and ramp bottom, making it available for mining in the early production phase of the near century-long mine life.
Under the new agreement, ICP's state lease holdings would increase to nearly 11 331 ha and would generate up to $8-million or more for the state land office, depending on product pricing, leasing fees and royalties each year once ICP is in production at its planned sulphate of potash mine and processing facility.
Over 13-million acres of land granted to New Mexico in 1898 and 1910 are held in trust for the state's public schools and universities, as well as special schools and hospitals that serve children with physical, visual and auditory disabilities.
ICP's Ochoa project is located in the Pecos valley section of the southern Great Plains physiographic province, about 100 km east of Carlsbad, New Mexico, and less than 32 km west of the Texas/New Mexico state line.
The overall project development plan provides for completion of the feasibility study by the end of August, final environmental permitting by the end of March 2014, and the start of construction of the mine and processing facility shortly thereafter.
The company’s stock closed down 1.16% on the TSX at 85 Canadian cents apiece on Wednesday.
Comments
The
content
you are trying to access is only available to subscribers.
If you are already a subscriber, you can Login Here.
If you are not a subscriber, you can subscribe now, by selecting one of the below options.
For more information or assistance, please contact us at subscriptions@creamermedia.co.za.
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation