https://www.miningweekly.com

Guyana Goldfields starts underground construction

11th November 2018

By: Creamer Media Reporter

     

Font size: - +

TSX-listed miner Guyana Goldfields has started underground development at the Aurora mine, in Guyana, completing the first blast on the Mad Kiss portal.

The blast is a key milestone and marks the start of underground construction, president and CEO Scott Caldwell reported on Friday.

The company stated that the contractor would complete and reinforce the collar and extend the decline 200 m to fulfil the scope of the early works phase. This should be completed early in the first quarter.

Guyana further reported that it was finalising the review of bids received for the underground development contract with the target of final award in the fourth quarter of 2018.

The plan is to advance the exploration decline about 2 500 m and provide a platform for further underground exploration and definition drilling.

The decline is intended to provide access to all principal underground mining areas, including some higher-grade zones in Mad Kiss and East Walcott that could potentially provide supplemental mill feed during the development period.

“The decline provides an ideal platform to potentially upgrade and expand the current underground resource and unlock the full potential of the Aurora deposit,” Caldwell stated.

The Aurora mine, which entered into production in 2016, produced 41 000 oz in the third quarter from openpit operations and is expected to produce between 150 000 oz and 155 000 oz in the full year.

The underground operations will deliver 2.1-million ounces of the 3.8-million ounces that the Aurora mine will recover by 2033. The 2018 optimised life of mine plan (2018 to 2033) contains a total of three-million tonnes of ore grading 2.87 g/t gold.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The functionality you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION