https://www.miningweekly.com

Goldplat lifts Q1 production

20th April 2016

By: Donna Slater

Features Deputy Editor and Chief Photographer

  

Font size: - +

JOHANNESBURG (miningweekly.com) – Aim-listed Goldplat produced 7 252 oz of gold in the first quarter of this year, thereby contributing to continued profitability and steady progress on priority capital projects.

During the quarter under review, the South Africa-based Goldplat Recovery (GPL) produced 4 864 oz of gold, of which 3 365 oz were sold for own account and 975 oz were returned to clients by way of metal transfers. Operating profit for the quarter was £845 000, bringing the unaudited nine-month year-to-date operating profit to £1.54-million.

Gold Recovery Ghana (GRG), meanwhile, produced 1 885 oz of gold in the first quarter, with 2 391 oz being sold.

GRG recorded an operating profit of £156 000 for the quarter, bringing the unaudited nine-month year-to-date operating profit to £458 000.

Meanwhile, the renewal of the Gold and Environmental Protection Agency licences for GRG were in progress and were expected to be concluded during the current quarter.
 
KILIMAPESA GOLD
During the first quarter, the Kenya-based Kilemapesa gold project produced 503 oz of gold, of which 442 oz were sold.

This resulted in an unaudited operating loss for the period of £169 000, bringing the nine-month year-to-date operating loss to £501 000. However, monthly losses relative to the previous six-month period were reduced by improving gold yields.
 
Goldplat CEO Gerard Kisbey-Green said the first quarter of 2016 has been good for Goldplat. “I am pleased to report continued profitability at the recovery operations and decreased losses at Kilimapesa.”

He added that good progress was made on major projects, including the Kilimapesa plant project and the GPL tailings storage facility.

Edited by David Shepherd
Proof Reader

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION