https://www.miningweekly.com

First Majestic sees near-term production potential at Ermitano

10th September 2018

By: Creamer Media Reporter

     

Font size: - +

Canadian silver miner First Majestic Silver exercised its option agreements over the Ermitaño and Cumobabi projects and has earned 100% of these projects, which are located near its operating Santa Elena mine, in Sonara, Mexico.

In terms of a 2014 option agreement with Evrim Resources, First Majestic has made a $1.5-million cash payment to the company and has granted to Evrim a 2% net smelter return royalty (NSR) in the case of the Ermitaño project and a 1.5% NSR in the case of the Cumobabi project. 

“Our exploration results at the Ermitaño West project have been extremely successful over the past 18 months and provide evidence of the regional potential across our vast 101 772 ha of mining concessions to build additional resources in close proximity to our Santa Elena operation,” said First Majestic president and CEO Keith Neumeyer.

The Ermitaño property has a maiden inferred resource of 40.8-million silver equivalent ounces and Neumeyer said that it had the potential to become a new, near-term source of production.

The Ermitaño property consists of 16 526 ha of mining concessions located adjacent to the Santa Elena claims, which host the producing Santa Elena main vein and First Majestic’s 3 000 t/d processing plant.

The Cumobabi property consists of 22 258 ha of mining concessions located south-east of the Ermitaño property. 

“First Majestic’s ongoing advancement of the Ermitaño West deposit will continue to create significant value for Evrim shareholders. First Majestic is in the midst of a 13 000 m infill and expansion drilling programme at Ermitaño West that is designed to extend the deposit at depth, to the west, and to test the Aitana vein.  We also look forward to additional work at the Cumobabi project where drilling was completed over the past year,” said Evrim CEO Paddy Nicol.

Edited by Mariaan Webb
Creamer Media Senior Deputy Editor Online

Comments

The content you are trying to access is only available to subscribers.

If you are already a subscriber, you can Login Here.

If you are not a subscriber, you can subscribe now, by selecting one of the below options.

For more information or assistance, please contact us at subscriptions@creamermedia.co.za.

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION